Best Practices for Construction Site Recycling (1996)
Summary:
Learnings from national research and two case studies on actual construction
job sites were used to develop a guide for reducing on-site waste and
maximizing recycling in construction. Recovered materials included acoustical
ceiling tiles, asphalt & concrete, gypsum drywall, woodwaste, metals,
cardboards and plastic films. 45% and 54% of the materials generated
(by weight) on the pilot buildings were recycled, for a cost savings
of $17,000 and $35,000 respectively.